Who and what: Equipment for a Mongolia project covering 50 tonnes per day of pharmaceutical washing wastewater and domestic sewage arrived at the site and was unloaded. Where and how: the site photographs show blue-and-white packaged treatment modules being lifted by mobile cranes onto flatbed trucks and set down on an open, hilly construction site, with container and crate storage nearby. Why it matters: for a remote site, the unloading stage is when the buyer can still verify module count, lifting points, external condition and packing marks before the units disappear into foundations and pipe trenches.

What the Unloading Site Shows
The images record a delivery in progress. A mobile crane holds a boxed module on its slings while a second blue-and-white unit stands alongside; flatbed trucks are positioned for transfer; further white-roofed modules are already grouped on the ground; wooden crates and shipping containers are stacked in the background; and an excavator is working on the earthworks. Several site personnel are present in high-visibility clothing and helmets. The terrain is open and dry with low hills, which is typical of a greenfield industrial site rather than a built-up factory extension.
What the images do not show is an operating plant. There is no evidence here of completed installation, piping tie-in, commissioning, or effluent quality. The correct project stage to describe is equipment arrival and unloading. Keeping that boundary matters: a packaged plant is a factory-built product, but its performance can only be established after installation and a period of operation. For buyers comparing this kind of delivery with a conventional civil build, our overview of packaged containerized sewage treatment plants for domestic wastewater explains where the factory-built approach saves time and where it does not.

Project Scope: 50 TPD Pharmaceutical Washing and Domestic Sewage
Two waste streams with different behaviour sit under one project label. Pharmaceutical washing wastewater comes from vessel, equipment and floor washing; its flow is intermittent and its COD, solvent residues, surfactants and pH can swing sharply between batches. Domestic sewage is steadier in volume and is characterised by BOD, suspended solids, ammonia nitrogen and phosphorus. Mixing them without thought produces a plant that is either oversized for the organic peaks or short of biological capacity for the daily nutrient load.
1. Equalisation and segregation
The first design decision is whether the two streams share an equalisation basin. A combined basin smooths the hydraulic peaks but dilutes the washing water only on paper — the shock load still arrives. Where local discharge limits are tight, keeping a separate buffer for the washing line and blending under controlled ratio is usually more stable. The buyer should provide a batch schedule, not just a daily total.
2. Biological treatment
Domestic sewage and the biodegradable fraction of washing wastewater are normally treated in an attached-growth or activated-sludge stage. Moving-bed biofilm reactors are popular in packaged plants because they tolerate flow variation without the settling problems of suspended sludge; our MBBR moving bed biofilm reactor guide covers the fill ratio, carrier selection and aeration checks. Where space is tighter or the effluent target is stricter, an integrated MBR unit replaces the clarifier, as described in the integrated MBR sewage treatment unit upgrade.
3. Polishing and sludge
Coagulation, filtration or disinfection is selected against the actual discharge consent, and sludge from both lines is thickened and dewatered. In a cold climate the equipment enclosure, pipe insulation and freeze protection are design inputs rather than afterthoughts — an item worth raising at the unloading stage, while access is still easy.

Key Features and Benefits of a Packaged Delivery
Less civil work on a remote site: the treatment steps are assembled and tested as modules in the factory, so site work is reduced to foundations, lifting, connections and commissioning.
Predictable transport units: each module has defined dimensions, weight and lifting points, which makes crane and truck planning straightforward.
Shorter site exposure: fewer weeks of on-site fabrication means less exposure to weather windows and local labour availability.
One as-built package: tanks, blowers, pumps, controls and internal pipework arrive against a single tag list, which simplifies the spare-parts list later.

Technical Specifications and Delivery Checkpoints
The following table is the checklist a buyer should work through while the modules are still on the trucks. The figures are the ones the buyer should confirm from the shipping documents, not results measured at this project.
| Checkpoint | What to confirm at unloading | Why it matters |
|---|---|---|
| Module count and tags | Every tag on the packing list is physically present and matches the nameplate | A missing module is cheapest to resolve while the truck is still on site |
| Dimensions and weight | Actual module size, gross weight, centre of gravity and lifting-lug condition | Determines crane capacity, sling angles and access-road turning radius |
| External condition | No transport damage to panels, coatings, roof openings, doors or inspection hatches | Any damage must be recorded against the carrier before signing |
| Design basis | 50 TPD total with the split between pharmaceutical washing and domestic sewage | Confirms the biological and equalisation stages are sized for the real load |
| Utilities and interfaces | Supply voltage and frequency, inlet and outlet flange sizes, earthing points | Prevents rework when the modules are set on their foundations |
| Cold-weather provisions | Insulation, heat tracing, enclosure rating and freeze-protection scope | Relevant for a site with a severe winter climate |
| Documents and spares | Manuals, certificates, recommended spares, warranty and after-sales contact | Needed before the commissioning team leaves the site |
For projects where the delivery also includes engineering and construction scope, the interface list grows; the overseas EPC wastewater plant contract note sets out the additional documents normally agreed at that stage.
What Baihuipu's Manufacturing Setup Means for Buyers
Baihuipu manufactures packaged wastewater equipment in its own factory, so the modules arriving at a site have been assembled, wired and checked as complete units before loading. For the buyer, that means the crane plan, tag list and spare-parts box all come from one source instead of three subcontractors. The engineering team that prepared the process design supports export documentation and site handover, and the same factory supplies replacement parts and after-sales technical support. On a remote site this single point of responsibility is practical rather than cosmetic: when a blower or membrane element is needed later, there is one as-built record to order against. Export deliveries of this type are part of the company's regular equipment business across Asia, Africa and other industrial markets.

Customer FAQs
Has the plant been commissioned? No. These photographs show unloading and staging only. Installation, piping connection, commissioning and performance testing are later stages, and no treatment result is claimed here.
What does 50 TPD refer to? The design flow of the project, covering pharmaceutical washing wastewater together with domestic sewage. The split between the two streams is a design input that the buyer confirms against the batch schedule.
Why use packaged modules instead of a concrete plant? Factory assembly reduces on-site civil and fabrication work and shortens the weather-dependent part of the schedule. It does not remove the need for proper foundations, access roads and freeze protection.
What should be checked before the crane leaves? Module count against tags, lifting-point condition, external damage, and the document and spares package. Our note on overseas after-sales and spare parts service explains how the spares list is normally structured for export plants.
Can the two streams be treated in one unit? Sometimes, but only after equalisation and load balancing are sized for the batch peaks. Buyers should ask for the design assumption in writing rather than assume a single tank handles both.
Why Choose Baihuipu as Your Manufacturer
Baihuipu operates its own production factory and has more than 20 years of experience building industrial water and wastewater equipment. We deliver whole systems — equalisation, biological treatment, membrane units, dosing, controls and sludge handling — as factory-assembled modules, with one engineering team responsible from process design through export packing and site handover. Our equipment has been supplied to industrial projects in a range of export markets, and the company works to documented quality and certification procedures. Spare parts, manuals and after-sales technical support come from the same factory, so the parts list always matches the as-built units. For a remote 50 TPD site, that continuity reduces the risk of a module arriving without the interfaces, documents or consumables needed to finish the job.
WhatsApp: +86 13631765076
To request a technical proposal or equipment quotation, please provide the design flow and the split between washing wastewater and domestic sewage, inlet and target effluent quality, the industry and operating conditions, site climate and location, and the available utilities. Our engineering team will return a configuration outline and the information required for a firm offer.