News

HOME» News»
Pry mounted equipment solves the problem of traditional Chinese medicine wastewater! Baihuipu environmental protection modular design reduces costs by 50%
Date:2025-05-06 09:24:06   View:131

        Due to the characteristics of high COD, high suspended solids, and easy scaling, traditional treatment processes for wastewater from traditional Chinese medicine production generally face pain points such as large land occupation, difficult operation and maintenance, and high costs. Baihuipu Environmental Protection Innovation has launched a pry mounted traditional Chinese medicine wastewater treatment system, which achieves a 60% reduction in land area and a 50% reduction in treatment costs through modular integration, anti blocking processes, and intelligent control technology. It helps pharmaceutical companies achieve efficient and compliant emissions and seize the opportunity for green transformation!    


        1、 Traditional Chinese Medicine Wastewater Treatment: Why is a Skid Mounted Device the Optimal Solution?    

        Industry pain point analysis:;  

      -Complex composition: containing viscous substances such as plant colloids, medicinal residues, saponins, etc., which can easily block pipeline equipment;    

      -Land shortage: The traditional "regulating tank+biochemical+sedimentation" process requires over 500 square meters of land, which is difficult for the factory to carry;    

      -Inefficient operation and maintenance: frequent manual inspections, large dosage of chemicals, and water treatment costs exceeding 30 yuan per ton.    


        Core advantages of Baihuipu's pry equipment:;  

      -Space intensive: Integrating pre-processing, evaporation concentration, and biochemical treatment in a 40 foot container, occupying only 150 square meters;    

      -Rapid production: Factory prefabrication takes 15 days, on-site debugging takes 3 days to start running, shortening the construction period by 80%;    

      -Anti blocking design: specially optimized for high viscosity wastewater, with a continuous operation cycle extended to 90 days.    


        2、 4 major technological upgrades of Baihuipu's pry installation equipment, directly targeting the pain points of pharmaceutical companies;  

        1. Modular process chain, flexible adaptation to water quality;  

      -Customized unit combination: According to the COD concentration (2000-20000mg/L), the "hydrolysis acidification+MBR membrane" or "multi effect evaporation+advanced oxidation" module can be freely selected to increase treatment efficiency by 40%;    

      -One click switching mode: supports intelligent adjustment of water volume during peak/off-season production, avoiding resource waste.    


        2. Anti blocking evaporation biochemical coupling system;  

      -Spiral turbulent evaporator: inner wall guide vane design+automatic scale scraping system, anti clogging performance improved by 70%;    

      -Pollution resistant MBR membrane module: Nano scale anti pollution PVDF membrane, flux attenuation rate<5%/year, with a lifespan of up to 8 years.    


        3. Intelligent unmanned operation and maintenance;  

      -AI algorithm warning: Real time monitoring of pH, turbidity, conductivity and other parameters, automatic adjustment of aeration rate and chemical dosage;    

      -Cloud platform remote control: View operational data on mobile devices, with a fault response time of less than 2 hours.    


        4. Closed loop recycling of waste residue resources;  

      -Pharmaceutical residue drying system: Low temperature heat pump technology reduces the moisture content from 80% to 15%, converting it into fuel or organic fertilizer raw materials;    

      -Reuse of condensate water: The COD of the water produced in the evaporation section is less than 50mg/L, and it is directly used for cleaning or irrigation in the factory area.    


        3. Traditional solution vs. Baihuipu pry installation equipment: data comparison   

        |Indicator          |Traditional sewage treatment plant;     |Baihuipu dismantling equipment;       |   

        |-------------------|-------------------------|---------------------------|   

        |Floor Area;         | ≥500㎡                  |≤ 150 ㎡ (stackable);         |   

        |Construction period;         |4-6 months                |18 days (factory prefabrication+on-site installation); |   

        |Cost per ton of water treatment;     |28-35 yuan;               |12-15 yuan (energy-saving+low maintenance);     |   

        |COD removal rate;         | 70-85%                  | ≥95%                      |   

        |Anti clogging ability;       |Weekly manual dredging;           |Automatic cleaning, quarterly maintenance once;     |   


        Case study:   

        A certain traditional Chinese medicine decoction piece factory processes 30 tons of wastewater per day. The original plan was to invest 2 million yuan to build a traditional sewage station, but after switching to the Baihuipu pry system:;  

      -Land saving: compressed from 600 square meters to 120 square meters, freeing up space for expanding warehouses;    

      -Cost reduction: The total investment has been reduced by 35%, and the energy consumption cost per ton of water has decreased from 2.8 yuan to 1.2 yuan;    

      -Compliance rate: COD has steadily decreased from 15000mg/L to below 80mg/L, saving over 600000 yuan in annual pollution discharge fees.    


        4、 Baihuipu Environmental Protection: Expert in Traditional Chinese Medicine Wastewater Treatment, Empowering the Whole Scene;  

        As a "specialized, refined, and innovative" enterprise certified by the Ministry of Industry and Information Technology, Baihuipu Environmental Protection is deeply involved in the field of high difficulty wastewater treatment and has launched:;  

      -Full process service: water quality testing → process design → equipment delivery → intelligent operation and maintenance → waste resource utilization;    

      -Six exclusive technologies: anti clogging evaporation, anti fouling MBR membrane, intelligent dosing, heat recovery, cloud control platform, modular expansion;    


        Faced with the dual pressure of land restrictions and environmental compliance, Baihuipu's modular Chinese herbal wastewater treatment system redefines industry standards with "modular integration+drug residue resource utilization". Call 13631765076 immediately to obtain a free 1V1 technical solution for pharmaceutical wastewater treatment to reduce costs and turn the burden of wastewater treatment into benefits!    


BACK
Contact Information
E-mail
E-mail: Baihuipu20@gmail.com
Headquarters
Headquarters: No. 3 Building, Tuoling Industrial Park, Dongcheng Street, Dongguan City, Guangdong Province (Baihupu)
Jiangsu
Jiangsu: No. 185, Building 57, Yuchi New Village, Jintan District, Changzhou City, Jiangsu Province
Sichuan
Sichuan: No. 25, 1st Floor, 360 South Lake Avenue, Tianfu New District, Chengdu City, Sichuan Province
Fujian
Fujian: Room 2101, Building B, Hengyu International, Wenquan Branch Road, Gulou District, Fuzhou City, Fujian Province
Hainan
Hainan: 6/F, Room F2-B4, Shenyah Building, No. 47, Guomao Road, Longhua District, Haikou City, Hainan Province
Baihuipu has provided solutions to over 120 industries and more than 1000 customers.
Sharing and Following
Copyright © 2025 Guangdong Baihuipu Environmental Protection and Energy Conservation Development Co., Ltd