Yunfu, Guangdong needed a compact 150-ton-per-day domestic sewage treatment plant for a township upgrade project. Baihuipu supplied an integrated biological treatment package, completed installation, and commissioned the plant to meet local discharge standards.

Project Background and Requirements

The existing infrastructure could not handle the growing domestic sewage load from a developing district.

The new plant had to fit a limited footprint, operate with minimal odor, and meet Class 1A discharge standards.

Remote monitoring was required because local operator availability was limited.

150tpd domestic sewage treatment plant China system overview

Process Design

Baihuipu selected an A/O biological process followed by secondary clarification and disinfection.

Fine screens and grit removal protect downstream biological units from debris and abrasive solids. The process logic sits close to what is described in Black Mass, Cobalt and Fluoride, particularly on the pretreatment side.

150tpd domestic sewage treatment plant China installation view

Sludge is thickened and dewatered on site for easy transport and disposal. Plants dealing with comparable loads face many of the same trade-offs covered in Chloride, Fluoride and Process Routes.

Equipment Supplied

The package includes a rotary screen, equalization tank, anoxic and aerobic tanks, clarifier, UV disinfection channel, and blower house.

All equipment was delivered as modular skids to reduce civil work and installation time.

150tpd domestic sewage treatment plant China equipment detail

Instrumentation includes DO meters, flow meters, and online effluent quality probes.

Construction and Commissioning

Installation was completed in coordination with the local civil contractor within the planned schedule.

150tpd domestic sewage treatment plant China project site

Seed sludge was introduced and the biological process was cultivated over two weeks.

Performance testing showed BOD5, COD, SS, ammonia, and TP values below the Class 1A limits.

What This Looks Like in Practice

For comparison, our 2021 project in Ordos, Inner Mongolia ran at 150 m³/day with influent COD near 1,800 mg/L and treated water around 500 mg/L. That is 72.2% removal in practice, not on paper.

LocationYearFlowFeed CODTreated CODRemoval
Ordos, Inner Mongolia2021150 m³/d1,800 mg/L500 mg/L72.2%

Figures are site-measured values from commissioned plants, not modelled estimates.

Outcome

The Yunfu plant has been operating continuously, serving approximately 1,500 residents. Plants dealing with comparable loads face many of the same trade-offs covered in Petrol Station UST Remediation system.

150tpd domestic sewage treatment plant China project site

Odor complaints dropped because the process is fully enclosed and the blower exhaust is filtered. Plants dealing with comparable loads face many of the same trade-offs covered in Fatty Acid, Soapstock and Glycerin.

Baihuipu's compact design helped the customer stay within budget and land constraints.

Why Choose Baihuipu as Your Manufacturer

Choosing a manufacturer here comes down to one question: who is still accountable once the commissioning team flies home. Our answer is that we build and programme our own equipment, then stand behind it for the life of the plant.

Manufacturing Base in Guangdong

Owned production lines mean we control tolerances, materials and delivery. Standard modular units and bespoke skids are both built by our own people, so schedule commitments are ours to keep.

20+ Years Across Dozens of Industries

Experience matters most when your waste stream behaves nothing like the textbook example. We have dealt with toxic organics, heavy metals, extreme salinity and refractory COD in food processing, chemical manufacturing, electroplating, mining and municipal projects.

Certification and Export Practice

CE marking is standard and we work to ISO 9001 procedures. Where a project calls for specific material grades, pressure vessel certification or ATEX-rated equipment, we build to that standard and ship the full documentation pack.

We Engineer the Whole Train

Screening, equalisation, biological or chemical treatment, membranes, evaporation, brine handling — the complete line comes from one organisation. Process design, mechanical, electrical and PLC programming sit under the same roof, so there is no gap for finger-pointing at handover.

Spares, Service and Commissioning

Membranes, dosing pumps, diffusers, instrumentation and blowers are stocked for the systems we sell. Our control systems support remote diagnostics, and we can put an engineer on site for commissioning, training or an unplanned shutdown.

Getting Started

Send us a water analysis and your production profile and we will tell you honestly what the process should look like and roughly what it costs to build and run. Reach our engineering team on WhatsApp: +86 13631765076 or via hkbhp.com.

WhatsApp: +86 13631765076

Frequently Asked Questions

What information do you need to quote?

Water analysis for your worst-case stream, peak and average flows, discharge limits, available footprint and utilities. If you do not have a full analysis yet, we can start from a partial one and flag the gaps.

How much operator attention does the system need day to day?

Automatic control handles dosing, backwash and level control. Realistically your team spends time on chemical top-up, sample testing and sludge handling — maybe one to two hours per shift on 150tpd domestic sewage duty, less if you opt for remote monitoring.

What does it cost to run, per cubic metre?

Energy dominates, then chemicals, then sludge disposal. We give you a per-cubic-metre breakdown during proposal so you can compare it against your sewer charge — treating too aggressively is a common and expensive mistake.

Can you work with our existing equipment?

Often yes. We regularly integrate into existing civil structures where the concrete is sound, replacing internals and controls rather than starting over. We will tell you honestly when legacy kit is beyond economic repair.

BACK
Contact Information
E-mail
E-mail: Baihuipu20@gmail.com
Headquarters
Headquarters: No. 3 Building, Tuoling Industrial Park, Dongcheng Street, Dongguan City, Guangdong Province (Baihupu)
Jiangsu
Jiangsu: No. 185, Building 57, Yuchi New Village, Jintan District, Changzhou City, Jiangsu Province
Sichuan
Sichuan: No. 25, 1st Floor, 360 South Lake Avenue, Tianfu New District, Chengdu City, Sichuan Province
Fujian
Fujian: Room 2101, Building B, Hengyu International, Wenquan Branch Road, Gulou District, Fuzhou City, Fujian Province
Hainan
Hainan: 6/F, Room F2-B4, Shenyah Building, No. 47, Guomao Road, Longhua District, Haikou City, Hainan Province
Baihuipu has provided solutions to over 120 industries and more than 1000 customers.
Sharing and Following
Copyright © 2025 Guangdong Baihuipu Environmental Protection and Energy Conservation Development Co., Ltd