A wastepaper recycling mill is not a smaller version of a virgin pulp mill, and treating its effluent as one is the quickest way to build a plant that underperforms. There is no pulping liquor, no black liquor recovery, and no lignin load in the kraft sense. What there is instead — and it is arguably harder — is a chemically assisted flotation process whose whole purpose is to push ink and stickies out of the fibre stream and into the water. The effluent is where everything the mill did not want ends up.

The Deinking Process and Its Effluent

A deinking line starts with repulping at high consistency under alkaline conditions, typically 1 to 2 percent NaOH with sodium silicate, hydrogen peroxide and a surfactant collector. The chemistry is designed to detach ink from fibre and to keep the detached particles dispersed so flotation can carry them off.

Flotation then removes the ink as a froth — 1 to 3 percent of the line flow by volume, but with a TSS of 20,000 to 60,000 mg/L. That froth is the single strongest stream in the mill and it is frequently pumped to the effluent plant without much thought.

The remaining water carries fibre fines, filler clay or calcium carbonate, dissolved organics from the alkaline peroxide stage, and the residual collector. COD of 2,000 to 8,000 mg/L is typical for the combined mill effluent, with BOD:COD around 0.3 to 0.5 — lower than a virgin mill, because a large share of the organic load has already been through one or two product life cycles. The same selection criteria reappear in Lead-Acid Battery Manufacturing Wastewater Treatment system, which is worth opening alongside this one.

Stickies Are the Defining Problem

Stickies are the adhesive fraction: hot-melt bookbinding glue, pressure-sensitive label adhesive, tape, latex binder from coated broke, wax. They enter at perhaps 0.5 to 2 percent of the furnish and they do not dissolve, do not biodegrade in any useful timeframe, and do not settle predictably.

They also change behaviour with temperature and shear. A sticky that passes a 100 µm screen at 45 °C can agglomerate into a 2 mm particle in a cooler clarifier and then smear across a filter cloth. This is why mills distinguish macrostickies from microstickies — the colloidal fraction below about 100 µm is the one that causes deposits on the paper machine and on membranes.

deinking wastewater treatment system

Removal is mechanical first: fine screening at 80 to 150 µm slots, then through-flow or forward cleaners, then flotation. Chemical fixation with a cationic polymer or a bentonite-talc microparticle system helps agglomerate the colloidal fraction so it can be floated or filtered. Nothing removes all of it. The design target is to keep the concentration below the level where deposits form, not to reach zero. For the reuse angle specifically, laboratory and research facility wastewater treatment goes further than we can here.

Ink and Colour

Flexographic newsprint ink is the difficult case. Unlike offset ink, water-based flexo ink disperses to a particle size below 1 µm, which is too fine for flotation and too fine to filter. It goes straight through and colours the effluent a characteristic grey. Carbon black from laser and digital print behaves similarly.

What Our Project Data Actually Shows

Across 42 commissioned plants where we hold complete COD records, influent COD ranged from 200 to 172,000 mg/L and treated effluent from 50 to 5,000 mg/L. Average removal across that set is 87.1% — not a marketing figure, but the measured mean.

That average is worth pausing on. It sits well below the 95%-plus numbers most suppliers quote, because the set includes genuinely difficult streams. On some electroplating and municipal duties the installed configuration only reaches about half the influent COD, and saying that up front is more use to you than a number the plant will never hold.

MetricMeasured value
Plants with complete COD records42
Influent COD range200 – 172,000 mg/L
Treated COD range50 – 5,000 mg/L
Average influent COD11,914 mg/L
Average treated COD264 mg/L
Average COD removal87.1%
Wastewater types covered30+
Delivery period on record2021–2022

Coagulation with a high-charge cationic coagulant followed by flocculation does remove a large part of it, and the sludge dewaters reasonably well. Colour removal of 70 to 90 percent is achievable on the combined effluent. Getting below 100 Pt-Co usually needs a tertiary step — activated carbon or a Fenton oxidation — and the cost of that step is the reason most mills settle for a visible tint in their discharge.

Worth saying plainly: if a mill is buying a lot of mixed office waste with heavy digital print content, the colour problem is upstream of the effluent plant. Furnish selection is the cheapest colour control available.

Modern recycling mills run at 5 to 15 m³ per tonne of paper, down from 40-plus a few decades ago. Closing the loop concentrates everything the mill cannot get rid of: dissolved salts, accumulated stickies, and — critically — calcium.

deinking wastewater treatment installation

Calcium builds up because the alkaline deinking chemistry dissolves calcium carbonate filler, and because process water make-up is usually hard. At 800 to 2,000 mg/L calcium and a pH above 9, scaling on the paper machine and in any membrane system becomes a certainty. Mills manage it with partial softening, acid dosing to hold pH lower, or a controlled purge.

Dissolved solids also drive a biological consideration. Closed-loop mills frequently run effluent chloride of 1,000 to 3,000 mg/L. Nitrification tolerates that with acclimatisation. It does not tolerate the sudden swings that follow a batch dump, so equalisation of at least 6 to 10 hours is not optional in a closed mill. If your site also runs this kind of duty, Landfill Leachate Treatment covers the cost side of the decision in more depth.

Treatment Train Selection

Primary treatment is almost always chemical: screening, then coagulation-flocculation with DAF or a lamella clarifier. That step removes most of the TSS, most of the ink and a good share of the stickies, and it takes COD down by 50 to 70 percent before biology ever sees the water.

Secondary treatment is biological, usually an activated sludge or MBR, occasionally an anaerobic stage first where the mill runs hot and the COD is high enough to justify biogas. Anaerobic pre-treatment on deinking effluent is less attractive than on virgin mill effluent because the BOD:COD is lower and the sulphate from sodium hydrosulphite bleaching generates sulphide.

Tertiary polishing depends entirely on the consent. Sand filtration handles residual TSS. Carbon handles colour and AOX. Where the mill wants to reuse clarified water back on the machine, a dissolved air flotation plus sand filter plus a disinfection step is usually the sweet spot — cheaper and more robust than membranes, and tolerant of the process upsets that recycling mills generate by nature.

Integrated Treatment Strategies

The same selection criteria reappear in Food Processing and Edible Oil Wastewater Treatment system, which is worth opening alongside this one. Most facilities do not run a single clean stream, and a shared equalisation and biological stage is usually the economical answer once the streams are chemically compatible.

Why Choose Baihuipu as Your Manufacturer

Two decades in this industry teaches you that most treatment problems are procurement problems in disguise. Someone bought the cheapest skid, nobody checked the equalisation volume, and eighteen months on the plant cannot hold its consent limit. We build differently.

Own Factory, Real Capacity

Tanks, skids, control panels and membrane housings are built in our own Guangdong facility. Nothing critical is subcontracted, which is why we can commit to delivery dates and hold quality across a batch instead of hoping the shop floor gets it right.

Two Decades of Field Data

Food and beverage, chemicals, electroplating, textile dyeing, mining, municipal work — we have commissioned across all of them. The useful part is not the project count, it is having seen how plants fail in year seven and designing those failures out.

Complete System Responsibility

One supplier, one process guarantee. We take the plant from preliminary screening through to membrane separation, evaporation and brine management, with process, mechanical, electrical and controls engineering handled internally.

Spares, Service and Commissioning

Membranes, dosing pumps, diffusers, instrumentation and blowers are stocked for the systems we sell. Our control systems support remote diagnostics, and we can put an engineer on site for commissioning, training or an unplanned shutdown.

Documentation You Can Actually Audit

Each system ships with as-built drawings, material certificates, welding records and a functional specification. If a client's own consultant wants to review the process calculation basis, we hand it over rather than treating it as proprietary.

Let's Look at Your Numbers

Share your water analysis and site constraints and we will give you a straight assessment of the process route and the realistic operating cost before you commit to anything. Contact our engineers at WhatsApp: +86 13631765076, or find us at hkbhp.com.

WhatsApp: +86 13631765076

Frequently Asked Questions

Which discharge standard will the treated water meet?

We design against whatever consent applies at your boundary — GB 8978, local sewer limits, or a ZLD target with no liquid discharge at all. The design basis is agreed in writing before fabrication, so there is no argument later about what "compliant" meant.

Do you handle installation and operator training?

Every unit we supply is commissioned by our own engineers. Training happens on site with your actual operators, and the O&M manual covers routine work plus troubleshooting. Remote diagnostics through the control system are included for the first year.

How much operator attention does the system need day to day?

Automatic control handles dosing, backwash and level control. Realistically your team spends time on chemical top-up, sample testing and sludge handling — maybe one to two hours per shift on deinking duty, less if you opt for remote monitoring.

BACK
Contact Information
E-mail
E-mail: Baihuipu20@gmail.com
Headquarters
Headquarters: No. 3 Building, Tuoling Industrial Park, Dongcheng Street, Dongguan City, Guangdong Province (Baihupu)
Jiangsu
Jiangsu: No. 185, Building 57, Yuchi New Village, Jintan District, Changzhou City, Jiangsu Province
Sichuan
Sichuan: No. 25, 1st Floor, 360 South Lake Avenue, Tianfu New District, Chengdu City, Sichuan Province
Fujian
Fujian: Room 2101, Building B, Hengyu International, Wenquan Branch Road, Gulou District, Fuzhou City, Fujian Province
Hainan
Hainan: 6/F, Room F2-B4, Shenyah Building, No. 47, Guomao Road, Longhua District, Haikou City, Hainan Province
Baihuipu has provided solutions to over 120 industries and more than 1000 customers.
Sharing and Following
Copyright © 2025 Guangdong Baihuipu Environmental Protection and Energy Conservation Development Co., Ltd