A hotel complex in Ivory Coast needed a 200-ton-per-day wastewater treatment system to handle sewage from guest rooms, kitchens, and laundry facilities. Baihuipu supplied a compact biological treatment package that produces water suitable for irrigation and landscape use.

Hotel Wastewater Characteristics

Combined flows from rooms, restaurants, and laundry produce variable organic loads and detergent residues.

Grease and food solids from kitchens require preliminary screening and separation.

High occupancy periods create significant flow peaks that must be equalized.

hotel wastewater treatment 200tpd Africa system overview

Process Selection

Baihuipu designed an extended-aeration activated-sludge process followed by clarification and sand filtration. A related discussion worth reading here is Chlorinated Hydrocarbons and Mercury.

Grease traps and screens protect the biological stage from fats and debris. Much of this mirrors the situation set out in Polyurethane and Foam Manufacturing Wastewater.

hotel wastewater treatment 200tpd Africa installation view

Disinfection with chlorination ensures safe reuse for non-potable applications.

Package Delivery and Site Work

Equipment was containerized and shipped to Abidjan, then trucked to the hotel site. The same selection criteria reappear in Soy Protein Isolate effluent, which is worth opening alongside this one.

Local workers installed the tanks and piping under Baihuipu supervision. A related discussion worth reading here is vaccine and biologics manufacturing wastewater.

hotel wastewater treatment 200tpd Africa equipment detail

Electrical and blower connections were completed with the hotel's MEP contractor.

Commissioning and Training

The biological system was seeded and brought to steady state over three weeks.

hotel wastewater treatment 200tpd Africa project site

Hotel maintenance staff were trained on daily checks, sludge wasting, and chemical dosing.

Measured Results from Plants We Built

For comparison, our 2021 project in Ordos, Inner Mongolia ran at 150 m³/day with influent COD near 1,800 mg/L and treated water around 500 mg/L. That is 72.2% removal in practice, not on paper.

LocationYearFlowFeed CODTreated CODRemoval
Ordos, Inner Mongolia2021150 m³/d1,800 mg/L500 mg/L72.2%

Figures are site-measured values from commissioned plants, not modelled estimates.

Effluent quality was tested weekly during the first month of operation.

The treated water meets the requirements for irrigation and landscape watering at the hotel.

hotel wastewater treatment 200tpd Africa project site

The customer reduced freshwater consumption and sewer discharge volumes. For the reuse angle specifically, Soy Sauce and Condiment Brewing effluent goes further than we can here.

Baihuipu's packaged approach minimized construction time in the tropical climate.

Why Choose Baihuipu as Your Manufacturer

Picking a supplier for this kind of plant is mostly about who carries the risk when something goes wrong. We have built this equipment for more than twenty years, and we are the ones who fabricated it, programmed the controls and will still answer the phone three years from now.

In-House Fabrication

Our Guangdong works produces everything from standard modular units to fully bespoke lines. Building in-house keeps cost, schedule and quality under our own control rather than a subcontractor's goodwill.

Experience Built the Hard Way

Since the early 2000s we have commissioned plants for food and beverage processors, chemical works, electroplaters, textile mills, mines and municipalities. The lessons that stick are scaling, fouling and sludge handling — those inform every design we issue.

Twenty-Plus Export Markets

We have shipped to the United States, Canada, Russia, Indonesia, India, Nigeria and Vietnam among others. Crating, export documentation and certificates are handled in-house, which keeps customs surprises to a minimum.

Certification and Export Practice

CE marking is standard and we work to ISO 9001 procedures. Where a project calls for specific material grades, pressure vessel certification or ATEX-rated equipment, we build to that standard and ship the full documentation pack.

Complete Units and Turnkey Plants

Whether you need a single package unit or a turnkey installation with civil works, we deliver the entire treatment scheme. Our engineering team covers process, mechanical, electrical and automation so one party owns the outcome.

After the Handover

Spares for everything we install are held in stock. Remote telemetry is available on most systems, and our service engineers commission, train your operators and turn out for emergencies.

Getting Started

Send us a water analysis and your production profile and we will tell you honestly what the process should look like and roughly what it costs to build and run. Reach our engineering team on WhatsApp: +86 13631765076 or via hkbhp.com.

WhatsApp: +86 13631765076

Frequently Asked Questions

Is hotel 200tpd Africa treatment suitable for water reuse?

Usually yes, once the process selection stage is stable. Reuse normally means adding membrane polishing to bring conductivity and COD down to your process water specification. We would need to see your reuse water limits to size it properly.

Do you handle installation and operator training?

Every unit we supply is commissioned by our own engineers. Training happens on site with your actual operators, and the O&M manual covers routine work plus troubleshooting. Remote diagnostics through the control system are included for the first year.

How much operator attention does the system need day to day?

Automatic control handles dosing, backwash and level control. Realistically your team spends time on chemical top-up, sample testing and sludge handling — maybe one to two hours per shift on hotel 200tpd Africa duty, less if you opt for remote monitoring.

BACK
Contact Information
E-mail
E-mail: Baihuipu20@gmail.com
Headquarters
Headquarters: No. 3 Building, Tuoling Industrial Park, Dongcheng Street, Dongguan City, Guangdong Province (Baihupu)
Jiangsu
Jiangsu: No. 185, Building 57, Yuchi New Village, Jintan District, Changzhou City, Jiangsu Province
Sichuan
Sichuan: No. 25, 1st Floor, 360 South Lake Avenue, Tianfu New District, Chengdu City, Sichuan Province
Fujian
Fujian: Room 2101, Building B, Hengyu International, Wenquan Branch Road, Gulou District, Fuzhou City, Fujian Province
Hainan
Hainan: 6/F, Room F2-B4, Shenyah Building, No. 47, Guomao Road, Longhua District, Haikou City, Hainan Province
Baihuipu has provided solutions to over 120 industries and more than 1000 customers.
Sharing and Following
Copyright © 2025 Guangdong Baihuipu Environmental Protection and Energy Conservation Development Co., Ltd